Brand new play area installed at St Mary’s CE Primary School

Vitality Play were contracted by St Mary’s CE Primary School in Hornsea, London N8 to transform a tired 936m2 concrete based play area. Within 5 days, the installation team at Vitality had transformed this area creating a green netball pitch, with yellow line markings surrounded by a play area that integrated their existing blue wet pour surface..

The school chose our Green Multisport surface which is supplied and installed with our 10 year manufacturers warranty. The school were over the moon with their new surface and a spokesperson commented “we are thrilled with the new surface which has totally transformed our play area, we are delighted with the quality of the installation and the service from Vitality Play”

3D Design

Latest News

Hyland House School, Tottenham (N17 9AB) Situated in London, Hyland House School contacted Vitality Play to resurface their outdoor play area. Our multi-play artificial grass was chosen to cover an area of 83 square metres. A variety

By |September 3rd, 2021|Categories: General|Tags: , |0 Comments

Mansfield Primary, Nottinghamshire (NG18 2LB) Mansfield Primary Academy contacted Vitality Play to resurface their outdoor play area. In addition to the resurfacing we also installed a timber climbing frame. Multiple colours of our Multi-Play artificial grass

By |September 3rd, 2021|Categories: General|Tags: , |0 Comments

Bridgewater Primary, Berkhamsted (HP4 1ES) Situated in Hertfordshire, Bridgewater Primary contacted Vitality Play to resurface and replace the fencing of their existing MUGA. Our green multi-sport surface covers the base of the MUGA which was an

By |August 30th, 2021|Categories: General|Tags: , |0 Comments

Willows Primary, Manchester (M22 1BQ) Situated in Wythenshawe, Willows Primary contacted Vitality Play to install a MUGA suitable to use for a multitude of sports. Our green multi-sport surface covers the base of the MUGA with yellow

By |August 30th, 2021|Categories: General|Tags: , |0 Comments

I'm interested in

Where did you hear about us?

When would you like your project to be completed?

Do you have funding in place?

Upload a picture of the area you like developing (optional)

By |2020-09-20T19:46:18+00:00July 1st, 2020|Daily Mile, muga|0 Comments